Design and Construction Projects

Engineering Coordination: Coordination of design engineering- procurement-construction of the electrical system associated with the Caprock Wind Ranch was completed for Texas Wind Power Company.

Distribution Line Construction and rehabilitation projects include preparation of staking sheets, line staking, construction contract preparation, construction observation, inspection and contract closeout document preparation.

Transmission Line Construction,
including preparation of plan and profile sheets for 69 and 138 kV transmission has been completed by EPE, Inc.

Substation Design and Construction
has been completed by EPE, Inc.  These projects included substation design, material and labor contract preparation, construction observation, inspection, testing and preparation of closeout documents.

Protective Relaying
projects include design, contract preparation, construction inspection, testing and closeout document preparation.  These relaying types include protection for substation projects and other miscellaneous projects, including transfer trip schemes over microwave channels, pilot wire relaying, impedance relaying, transformer differential relaying, load shedding, breaker failure relaying and time-overcurrent relaying.

Supervisory Control and Data Acquisition (SCADA)
system services have included design, material specifications, installation specifications and testing specifications for SCADA systems installed with Remote Terminal Units.

Power Plant Operation
scheduling to determine the most economical mix of generated and purchased power has been completed for our clients.

System Operations Summary
reporting summarizes input from information metering installed on substations and distribution feeders on a quarterly basis.  These recommendations include capacitor switching, phase balancing and load shifting.

System Mapping
using computer aided drafting (CAD) has been completed for EPE's clients.  This mapping includes preparation of dispatching maps, circuit diagrams, truck maps, detail maps, director's district maps, certification boundary maps and key maps.

Voltage Regulator Settings, including load drop compensation settings, are prepared for system voltage regulators after revisions of System Work Plans.

System Maintenance Plans,
including inspection and preventative maintenance programs for substations and switching stations have been prepared by EPE, Inc.

Work Order Inspections
are routinely completed by EPE, Inc.

Expert Witness
services in matters concerning personal injury, construction disputes, contract disputes and system reliability disputes have been completed for rural electric cooperatives, municipal electric systems and large corporations.

Apartment Submetering
services, including meter reading, meter calibration and tenant bill preparation is completed monthly for EPE's clients.

Details of our Design and Construction Projects

___________________________________________

Home | Engineering Services | Renewable Energy Development | System Planning Services
Design and Construction Projects | International Projects | Principals | Software
Software Products | Software Clients | Software news | Contact Us
Web Design by Dazzle Web
©2002 Dazzle Web